FOR WIRE PRODUCTS

  1. So that the wire does not loose its good appearance or gloss we recommend that the protective film is not removed before using the wire.
  2. Do not leave wires or nails exposed to environmental conditions (sun radiation, rain, etc) if not to be installed directly.
  3. When unloading wire, extra care should be taken especially when using cranes with belts to avoid distortion of wire edges and abrasions causing the lose of their galvanizing affect.

FOR PANELS

  1. Because of similarity of both faces of panels (PUR/PIR), the external side is the side that we see when we have the package in front of us. It is important that we do not change sides when installing and always follow the order so that all inner and all outer sides coincide.
  2. Only when we have finished with the installation do we remove the protective film which we recommend should be done within 15 days of completion. 
  3. Panels (PUR/PIR) must be protected from weather conditions (sun radiation, rain, ect) if not to be installed directly. 
  4. When unloading panels (PUR/PIR) from truck, extra care should be taken especially when using cranes with belts to avoid distortion of joint edges thus making fitting difficult. 
  5. Do not slide one panel (PUR/PIR) from another, but lift panels (PUR/PIR) as to avoid scratches and damages of the surfaces and immediate corrosion.